Skip to content

docs: plan the six days to the 2026-09-30 hard stop - #161

Merged
twistedmelonman merged 2 commits into
mainfrom
claude/docs-finish-line-plan-8a854048
Sep 25, 2026
Merged

twistedmelonman merged 2 commits into
mainfrom
claude/docs-finish-line-plan-8a854048

Conversation

@twistedmelonman

Copy link
Copy Markdown
Member

What this is

A new plan for the six days to the 2026-09-30 hard stop:
docs/superpowers/plans/2026-09-24-finish-line.md. It does not edit STATUS.md; STATUS gets rewritten as-of 9/30 as part of the plan's floor.

What is in it

  • Where the plan stood at the 09-16 pause, and what the 90 PRs merged since then changed (almost nothing on-plan: W3, credential rotation and the digest App have not moved).
  • A triage of all 163 open issues across the 18 dev-env repos: 43 LAND, 80 PARK, 22 certain closes, 18 closes that need Andrew's call.
  • Seven decisions (D1–D7) that need an answer before Day 1, each with a recommendation.
  • Blockers, seven workstreams, and a Thu–Wed calendar with checkpoints CP1–CP4 and a slip rule.

Data

Measured 2026-09-24 with per-owner tokens, in 2026-09-24-finish-line/:

  • triage.tsv: every open issue with bucket, priority, effort, human gate and evidence
  • fleet-protection.tsv: required checks on all 42 non-archived repos
  • w3-readiness.tsv: last five standards-check runs on the 32 repos W3 still flips

Corrections this surfaces in STATUS.md

  1. Part D is done on TILSIT and MIMOLETTE (hosts.yml checked over SSH).
  2. dev-env#89 closed on 09-11.
  3. The five W3 repos replaced claude-review; none requires both checks.
  4. The fleet is 42: 24 smartwatermelon, 11 nightowlstudiollc, 7 twistedmelonman.

Claude Code Bot added 2 commits September 24, 2026 19:31
A new plan, not a revision of STATUS.md's ordering. It records where the
plan stood at the 09-16 pause, what 90 merged PRs changed since, a triage
of all 163 open issues across the 18 dev-env repos, seven decisions that
need an answer before Day 1, and a day-by-day calendar with checkpoints.

Measured 2026-09-24 with per-owner tokens. The data files under
2026-09-24-finish-line/ hold the triage, the required checks on all 42
repos, and the last standards-check runs on the 32 repos W3 still flips.

Four STATUS.md claims are now known to be wrong and are listed in the
plan: Part D is done on both machines, dev-env#89 is closed, the five W3
repos replaced claude-review rather than adding standards-check alongside
it, and the fleet split is 24/11/7.
Andrew approved all seven decisions on 2026-09-24. D3's batched UI merges
skip pre-merge-review.sh silently, which is the defect dev-env#109
describes, so #109 moves from PARK to LAND (P1, target Sat 9/26) in WS5.
Until it ships, merge windows add a post-merge audit of lockless merges.
@twistedmelonman
twistedmelonman merged commit 48ff3b1 into main Sep 25, 2026
3 checks passed
@twistedmelonman
twistedmelonman deleted the claude/docs-finish-line-plan-8a854048 branch September 25, 2026 05:00
This was referenced Sep 25, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant