Skip to content

👷 ci(maintenance): use the current target tip - #80

Merged
gaborbernat merged 1 commit into
mainfrom
fix/maintenance-current-base
Nov 24, 2026
Merged

gaborbernat merged 1 commit into
mainfrom
fix/maintenance-current-base

Conversation

@gaborbernat

Copy link
Copy Markdown
Member

Scheduled lockfile updates started before the Scorecard rollback and tried to push branches carrying the old Scorecard workflow after the rollback merged. GitHub rejected the pushes because the release App lacks permission to change workflows. tox run

The read-only job validates each patch against the current tip of the PR's target branch. The writer verifies the patch digest, builds on the validated commit, and stops if the target branch has since moved.

A scheduled run can finish generating a lockfile after a workflow update
merges. A branch built from that old event commit can contain a workflow
change the release App has no permission to push.

Validate against the current target and bind the writer to that commit.
@gaborbernat gaborbernat added bug Something isn't working skip news No user-facing release note needed labels Nov 24, 2026
@gaborbernat
gaborbernat merged commit f1a85e3 into main Nov 24, 2026
11 checks passed
@gaborbernat
gaborbernat deleted the fix/maintenance-current-base branch November 24, 2026 20:11
This was referenced Nov 24, 2026
gaborbernat added a commit to gaborbernat/pypi-changes that referenced this pull request Nov 24, 2026
Scheduled dependency updates can finish after the target branch
advances. The shared maintenance workflow now validates each patch
against the current target commit, so a lockfile update can build on
intervening workflow changes with the existing release App permissions.
[Shared maintenance
fix](tox-dev/github-workflows#80) · [Release
6.8.7](https://github.com/tox-dev/github-workflows/releases/tag/6.8.7)
gaborbernat added a commit to pytest-dev/pytest-env that referenced this pull request Nov 24, 2026
Scheduled dependency updates can finish after the target branch
advances. The shared maintenance workflow now validates each patch
against the current target commit, so a lockfile update can build on
intervening workflow changes with the existing release App permissions.
[Shared maintenance
fix](tox-dev/github-workflows#80) · [Release
6.8.7](https://github.com/tox-dev/github-workflows/releases/tag/6.8.7)
gaborbernat added a commit to pytest-dev/pytest-print that referenced this pull request Nov 24, 2026
Scheduled dependency updates can finish after the target branch
advances. The shared maintenance workflow now validates each patch
against the current target commit, so a lockfile update can build on
intervening workflow changes with the existing release App permissions.
[Shared maintenance
fix](tox-dev/github-workflows#80) · [Release
6.8.7](https://github.com/tox-dev/github-workflows/releases/tag/6.8.7)
gaborbernat added a commit to gaborbernat/bump-deps-index that referenced this pull request Nov 24, 2026
Scheduled dependency updates can finish after the target branch
advances. The shared maintenance workflow now validates each patch
against the current target commit, so a lockfile update can build on
intervening workflow changes with the existing release App permissions.
[Shared maintenance
fix](tox-dev/github-workflows#80) · [Release
6.8.7](https://github.com/tox-dev/github-workflows/releases/tag/6.8.7)
gaborbernat added a commit to gaborbernat/mdformat-hugo that referenced this pull request Nov 24, 2026
Scheduled dependency updates can finish after the target branch
advances. The shared maintenance workflow now validates each patch
against the current target commit, so a lockfile update can build on
intervening workflow changes with the existing release App permissions.
[Shared maintenance
fix](tox-dev/github-workflows#80) · [Release
6.8.7](https://github.com/tox-dev/github-workflows/releases/tag/6.8.7)
gaborbernat added a commit to tox-dev/pre-commit-uv that referenced this pull request Nov 24, 2026
Scheduled dependency updates can finish after the target branch
advances. The shared maintenance workflow now validates each patch
against the current target commit, so a lockfile update can build on
intervening workflow changes with the existing release App permissions.
[Shared maintenance
fix](tox-dev/github-workflows#80) · [Release
6.8.7](https://github.com/tox-dev/github-workflows/releases/tag/6.8.7)
gaborbernat added a commit to tox-dev/action-pre-commit-uv that referenced this pull request Nov 24, 2026
Scheduled dependency updates can finish after the target branch
advances. The shared maintenance workflow now validates each patch
against the current target commit, so a lockfile update can build on
intervening workflow changes with the existing release App permissions.
[Shared maintenance
fix](tox-dev/github-workflows#80) · [Release
6.8.7](https://github.com/tox-dev/github-workflows/releases/tag/6.8.7)
gaborbernat added a commit to gaborbernat/simplint that referenced this pull request Nov 24, 2026
Scheduled dependency updates can finish after the target branch
advances. The shared maintenance workflow now validates each patch
against the current target commit, so a lockfile update can build on
intervening workflow changes with the existing release App permissions.
[Shared maintenance
fix](tox-dev/github-workflows#80) · [Release
6.8.7](https://github.com/tox-dev/github-workflows/releases/tag/6.8.7)
gaborbernat added a commit to tox-dev/python-discovery that referenced this pull request Nov 24, 2026
Scheduled dependency updates can finish after the target branch
advances. The shared maintenance workflow now validates each patch
against the current target commit, so a lockfile update can build on
intervening workflow changes with the existing release App permissions.
[Shared maintenance
fix](tox-dev/github-workflows#80) · [Release
6.8.7](https://github.com/tox-dev/github-workflows/releases/tag/6.8.7)
gaborbernat added a commit to tox-dev/devpi-process that referenced this pull request Nov 24, 2026
Scheduled dependency updates can finish after the target branch
advances. The shared maintenance workflow now validates each patch
against the current target commit, so a lockfile update can build on
intervening workflow changes with the existing release App permissions.
[Shared maintenance
fix](tox-dev/github-workflows#80) · [Release
6.8.7](https://github.com/tox-dev/github-workflows/releases/tag/6.8.7)
gaborbernat added a commit to tox-dev/jetbrains-fish that referenced this pull request Nov 24, 2026
Scheduled dependency updates can finish after the target branch
advances. The shared maintenance workflow now validates each patch
against the current target commit, so lockfile updates can build on
intervening workflow changes with the existing release App permissions.
[Shared maintenance
fix](tox-dev/github-workflows#80)

The Gradle UI job stores its dependencies and cache index in one entry.
The next successful default-branch run can refill the cache after
eviction. [Shared Gradle
fix](tox-dev/github-workflows#81) · [Release
6.8.7](https://github.com/tox-dev/github-workflows/releases/tag/6.8.7)
gaborbernat added a commit to tox-dev/tox-ini-fmt that referenced this pull request Nov 24, 2026
Scheduled dependency updates can finish after the target branch
advances. The shared maintenance workflow now validates each patch
against the current target commit, so a lockfile update can build on
intervening workflow changes with the existing release App permissions.
[Shared maintenance
fix](tox-dev/github-workflows#80) · [Release
6.8.7](https://github.com/tox-dev/github-workflows/releases/tag/6.8.7)
gaborbernat added a commit to tox-dev/pyproject-api that referenced this pull request Nov 24, 2026
Scheduled dependency updates can finish after the target branch
advances. The shared maintenance workflow now validates each patch
against the current target commit, so a lockfile update can build on
intervening workflow changes with the existing release App permissions.
[Shared maintenance
fix](tox-dev/github-workflows#80) · [Release
6.8.7](https://github.com/tox-dev/github-workflows/releases/tag/6.8.7)
gaborbernat added a commit to tox-dev/sphinx-argparse-cli that referenced this pull request Nov 24, 2026
Scheduled dependency updates can finish after the target branch
advances. The shared maintenance workflow now validates each patch
against the current target commit, so a lockfile update can build on
intervening workflow changes with the existing release App permissions.
[Shared maintenance
fix](tox-dev/github-workflows#80) · [Release
6.8.7](https://github.com/tox-dev/github-workflows/releases/tag/6.8.7)
gaborbernat added a commit to pypa/pipx that referenced this pull request Nov 24, 2026
Scheduled dependency updates can finish after the target branch
advances. The shared maintenance workflow now validates each patch
against the current target commit, so a lockfile update can build on
intervening workflow changes with the existing release App permissions.
[Shared maintenance
fix](tox-dev/github-workflows#80) · [Release
6.8.7](https://github.com/tox-dev/github-workflows/releases/tag/6.8.7)
gaborbernat added a commit to tox-dev/sphinx-autodoc-typehints that referenced this pull request Nov 24, 2026
Scheduled dependency updates can finish after the target branch
advances. The shared maintenance workflow now validates each patch
against the current target commit, so a lockfile update can build on
intervening workflow changes with the existing release App permissions.
[Shared maintenance
fix](tox-dev/github-workflows#80) · [Release
6.8.7](https://github.com/tox-dev/github-workflows/releases/tag/6.8.7)
gaborbernat added a commit to tox-dev/python-sbom that referenced this pull request Nov 24, 2026
Scheduled dependency updates can finish after the target branch
advances. The shared maintenance workflow now validates each patch
against the current target commit, so a lockfile update can build on
intervening workflow changes with the existing release App permissions.
[Shared maintenance
fix](tox-dev/github-workflows#80) · [Release
6.8.7](https://github.com/tox-dev/github-workflows/releases/tag/6.8.7)
gaborbernat added a commit to tox-dev/platformdirs that referenced this pull request Nov 24, 2026
Scheduled dependency updates can finish after the target branch
advances. The shared maintenance workflow now validates each patch
against the current target commit, so a lockfile update can build on
intervening workflow changes with the existing release App permissions.
[Shared maintenance
fix](tox-dev/github-workflows#80) · [Release
6.8.7](https://github.com/tox-dev/github-workflows/releases/tag/6.8.7)
gaborbernat added a commit to tox-dev/xml-fmt that referenced this pull request Nov 24, 2026
Scheduled dependency updates can finish after the target branch
advances. The shared maintenance workflow now validates each patch
against the current target commit, so a lockfile update can build on
intervening workflow changes with the existing release App permissions.
[Shared maintenance
fix](tox-dev/github-workflows#80) · [Release
6.8.7](https://github.com/tox-dev/github-workflows/releases/tag/6.8.7)
gaborbernat added a commit to tox-dev/tox-gh that referenced this pull request Nov 24, 2026
Scheduled dependency updates can finish after the target branch
advances. The shared maintenance workflow now validates each patch
against the current target commit, so a lockfile update can build on
intervening workflow changes with the existing release App permissions.
[Shared maintenance
fix](tox-dev/github-workflows#80) · [Release
6.8.7](https://github.com/tox-dev/github-workflows/releases/tag/6.8.7)
gaborbernat added a commit to tox-dev/mdformat-zola that referenced this pull request Nov 24, 2026
Scheduled dependency updates can finish after the target branch
advances. The shared maintenance workflow now validates each patch
against the current target commit, so a lockfile update can build on
intervening workflow changes with the existing release App permissions.
[Shared maintenance
fix](tox-dev/github-workflows#80) · [Release
6.8.7](https://github.com/tox-dev/github-workflows/releases/tag/6.8.7)
gaborbernat added a commit to tox-dev/tox-uv that referenced this pull request Nov 24, 2026
Scheduled dependency updates can finish after the target branch
advances. The shared maintenance workflow now validates each patch
against the current target commit, so a lockfile update can build on
intervening workflow changes with the existing release App permissions.
[Shared maintenance
fix](tox-dev/github-workflows#80) · [Release
6.8.7](https://github.com/tox-dev/github-workflows/releases/tag/6.8.7)
gaborbernat added a commit to tox-dev/tox that referenced this pull request Nov 24, 2026
Scheduled dependency updates can finish after the target branch
advances. The shared maintenance workflow now validates each patch
against the current target commit, so a lockfile update can build on
intervening workflow changes with the existing release App permissions.
[Shared maintenance
fix](tox-dev/github-workflows#80) · [Release
6.8.7](https://github.com/tox-dev/github-workflows/releases/tag/6.8.7)
gaborbernat added a commit to pypa/virtualenv that referenced this pull request Nov 24, 2026
Scheduled dependency updates can finish after the target branch
advances. The shared maintenance workflow now validates each patch
against the current target commit, so a lockfile update can build on
intervening workflow changes with the existing release App permissions.
[Shared maintenance
fix](tox-dev/github-workflows#80) · [Release
6.8.7](https://github.com/tox-dev/github-workflows/releases/tag/6.8.7)
gaborbernat added a commit to tox-dev/pipdeptree that referenced this pull request Nov 24, 2026
Scheduled dependency updates can finish after the target branch
advances. The shared maintenance workflow now validates each patch
against the current target commit, so a lockfile update can build on
intervening workflow changes with the existing release App permissions.
[Shared maintenance
fix](tox-dev/github-workflows#80) · [Release
6.8.7](https://github.com/tox-dev/github-workflows/releases/tag/6.8.7)
gaborbernat added a commit to tox-dev/peryx that referenced this pull request Nov 24, 2026
Scheduled dependency updates can finish after the target branch
advances. The shared maintenance workflow now validates each patch
against the current target commit, so a lockfile update can build on
intervening workflow changes with the existing release App permissions.
[Shared maintenance
fix](tox-dev/github-workflows#80) · [Release
6.8.7](https://github.com/tox-dev/github-workflows/releases/tag/6.8.7)
gaborbernat added a commit to tox-dev/turbohtml that referenced this pull request Nov 24, 2026
Scheduled dependency updates can finish after the target branch
advances. The shared maintenance workflow now validates each patch
against the current target commit, so a lockfile update can build on
intervening workflow changes with the existing release App permissions.
[Shared maintenance
fix](tox-dev/github-workflows#80) · [Release
6.8.7](https://github.com/tox-dev/github-workflows/releases/tag/6.8.7)
gaborbernat added a commit to tox-dev/filelock that referenced this pull request Nov 24, 2026
Scheduled dependency updates can finish after the target branch
advances. The shared maintenance workflow now validates each patch
against the current target commit, so a lockfile update can build on
intervening workflow changes with the existing release App permissions.
[Shared maintenance
fix](tox-dev/github-workflows#80) · [Release
6.8.7](https://github.com/tox-dev/github-workflows/releases/tag/6.8.7)
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

bug Something isn't working skip news No user-facing release note needed

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant